Drilled Pier Solution For Slab Homes |
|||||
|---|---|---|---|---|---|---|
|
Technique
A 12 inch diameter column is drilled to a depth of 12 to 16 feet. A 2 foot diameter “Bell” is installed at the bottom of the column to provided additional support. The bell and column are then filled with concrete and reinforced with 5/8 inch rebar.
|
![]() |
Warranty
Advantages
A-Tech utilizes an advanced drilling system to minimize disruption to lawn and shrubs (no heavy equipment)
|
||||
|
![]() |
|
||||
|
![]() |
|
||||